|
Dry Bulks
Workington offers excellent facilities
for dry bulk cargoes. There are 6 berths with a total length of 500m.
Loading rates average from approximately 600m/tonnes per hour, discharge
rates approximately 300m/tonnes per hour. Vessels up to 10,000 DWAT can
be accommodated.
Well established dry bulks are gypsum and perlite, which is imported by
British Gypsum for the manufacture of plasterboard at their factory at
Kirkby Thore near Penrith. About 200,000 tonnes of gypsum and perlite
are handled every year at Workington and are discharged directly from
the vessel to covered storage or open quay and road hauled the short distance
to the factory.
|
|


|
|